2010-12 Singapore Public Housing: Twenty-two HDB BTO Projects yielding 16,500 Dwelling Units (DU), ready by 2014, on 58 Hectares (ha) of HDB land (285 DU/ha). Each project has an average of 750 DU. HDB will spend $2.3 billion for their construction or $137,000/DU.PDF Sales Booklet: Punggol ParcVista; Punggol Waterway Terraces; Tampines GreenLeaf.Punggol Waterway ··»

2010-12 On Housing: Public housing in Singapore as such is not generally considered as a sign of poverty or lower standards of living as compared to public housing in other countries. Although they are generally about three times cheaper than privately-built homes in Singapore. The Housing and Development Board (HDB), established ··»